Ayodhya Ram Mandir Opening Date, Current Status, Design, Model, Updates

Check out details about Ayodhya Ram Mandir Opening Date, Current Status, Design, Model, and Updates from this article. Different details regarding Ayodhya Ram Mandir Opening Date, Current Status, Design, Model, Updates, and other necessary details are included in this article.


Ayodhya Ram Mandir Opening Date

Many devotees across India are eager to know the opening date of Ayodhya Ram Mandir. The construction of this significant Temple in Ayodhya is in its final stages. Moreover, it is expected that the Ayodhya Ram Mandir will be completed by 2024.

India Vs China Power Comparison

Richest Country In The World

Richest Woman In The World

Most Handsome Man In The World

Most Beautiful Woman In The World

The initial construction of Ayodhya Ram Mandir began after Bhoomi Poojan Ceremony on August 5, 2020. Since then, numerous devotees are eagerly waiting for the completion of Ayodhya Ram Mandir’s construction. After the completion of its construction, this significant Temple will be opened to devotees.

Ayodhya Ram Mandir Enoguration

According to the latest information, Ayodhya Ram Mandir will open for everyone on January 25, 2024. However, before opening this significant Temple for everyone, a pran pratishtha ceremony will be organized from January 15 to January 24. In addition, PM Narendra Modi will attend this ceremony on January 24, after which Ayodhya Ram Mandir will be opened for everyone.

Many people from all over the country are expected to visit this temple after its opening. This is because the Ayodhya Ram Mandir holds a very significant value. Therefore, this prominent and one of the biggest temples in India will open on January 25 for everyone.

Ayodhya Ram Mandir Current Status

According to the information, currently, the final phase of Ayodhya Ram Mandir is going on. Moreover, around 70% groundwork of Ayodhya Ram Mandir is completed. The remaining percentage of construction will be completed very soon. In addition, around 40% of the roof work of this significant temple is also completed. With the completion of the ground and roof works, this significant temple has started to take its prominent shape.

Ayodhya Ram Mandir Opening Date

After the completion of the final phase, Ayodhya Ram Mandir is expected to be ready by 2024. Moreover, shaligram rocks will be used to carve the idol of Ram Lalla in the Sanctorum. These rocks were sent from Nepal to India in January. According to the information, Ayodhya Ram Mandir’s ground floor construction is about to be completed.

Ayodhya Ram Mandir Design

The architect of this prominent Ayodhya Ram Mandir is Chandrakant Sompura. He, along with his sons, prepared the new design of this temple. However, the design for Ayodhya Ram Mandir was originally prepared by the Sompura Family in 1988. Hence, the architects made some changes in design and other things and prepared the new design in 2020. The design was created in adherence to both vastu shastra and shilpa shastras.

Ayodhya Ram Mandir will be 161 feet high and 235 feet wide. Ayodhya Ram Mandir will have 366 columns. Moreover, these columns will have 16 idols each, which will include the incarnations of Chausath Yoginis, Shiva, Sarasvati and Dashavataras. The stairs of this temple will be 16 feet wide.

Ayodhya Ram Mandir Model

The height of Ram Mandir is 161 feet, and the site area is 2.7 acres. Previously, due to COVID-19, the construction of this prominent temple was temporarily paused. The model of Ayodhya Ram Mandir was showcased in the Kumbh Mela. According to the information, the Ayodhya Ram Mandir will have 3 storeys.

In addition, this temple will have 5 mandapas in the middle of garbhagriha and entry. Moreover, these mandapas will be decorated with shikhara, with the tallest one above Garbhagriha. Aside from this, Ayodhya Ram Mandie will also have a prayer hall, museum, lecture hall, cafeteria, etc.

Ayodhya Ram Mandir Updates

The construction, which is in its final phase, is expected to be completed soon. In 2022, more than 50% of the construction of Ayodhya Ram Mandir was completed. This information was told by CM Yogi. This shows that the construction will be completed by 2024. Currently, the ground floor of this prominent Ram Mandir is being constructed.

Adipurush Box Office Collection

Adipurush Hit Or Flop?

Adipurush Dialogue Controversy

Adipurush OTT Rights Sold

Adipurush Ticket Booking Link

According to the chairman of the Ram Mandir Construction Committee, this temple will open on January 25 after the completion of the pran pratishtha ceremony. This ceremony will be attended by the PM, who also laid the foundation stone on August 5, 2020.

As the construction draws closer to completion, followers eagerly anticipate the grand opening of this significant temple. Moreover, the current construction phase of the ground floor of the Ayodhya Ram Mandir will be done by Diwali.

BSEH Home Page Click Here